Our system is currently under heavy load due to increased usage. We're actively working on upgrades to improve performance. Thank you for your patience.
2009
DOI: 10.1016/j.energy.2009.02.017
|View full text |Cite
|
Sign up to set email alerts
|

Modeling the time and cost to drill an offshore well

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
15
0
1

Year Published

2012
2012
2022
2022

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 53 publications
(16 citation statements)
references
References 26 publications
0
15
0
1
Order By: Relevance
“…Some drilling site features such as depth, operator and workforce experience, and the environmental situation can significantly impact the operator's decision regarding the rig type and contract selection. Other contingencies like stuck pipe and mechanical equipment failure are not predictable; but, they can greatly affect the cost and time of drilling [5]. Geothermal drilling technologies have developed from a combination of oil and gas and hydrothermal drilling technology as their equipment and materials are similar.…”
Section: Introductionmentioning
confidence: 99%
“…Some drilling site features such as depth, operator and workforce experience, and the environmental situation can significantly impact the operator's decision regarding the rig type and contract selection. Other contingencies like stuck pipe and mechanical equipment failure are not predictable; but, they can greatly affect the cost and time of drilling [5]. Geothermal drilling technologies have developed from a combination of oil and gas and hydrothermal drilling technology as their equipment and materials are similar.…”
Section: Introductionmentioning
confidence: 99%
“…The temperature is one of the most prominent factors affecting 2 of 33 production operations, including reservoir characterization and the qualitative or quantitative interpretation of fluid rheology, cementing quality, thermal fatigue failure, pressure control and stability for wellbore, etc. [1][2][3].…”
Section: Introductionmentioning
confidence: 99%
“…A construção de poços marítimos tem se mostrado uma atividade complexa e de alto risco [Kaiser, 2009]. Para efetuar esta atividade as empresas operadoras se valem principalmente das unidades de intervenção de poços, também conhecidas como sondas marítimas.…”
Section: Introductionunclassified