2012
DOI: 10.1080/1331677x.2012.11517537
|View full text |Cite
|
Sign up to set email alerts
|

Using A Integrated MCDM Model for Mining Method Selection in Presence of Uncertainty

Abstract: The aim objective of this study is to model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
13
0

Year Published

2013
2013
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 23 publications
(13 citation statements)
references
References 81 publications
(47 reference statements)
0
13
0
Order By: Relevance
“…The evaluation process is based on 3 groups of criteria that involve 6 subcriteria. The list of criteria and sub-criteria are formed accordingly to the papers of the: Ataei et al (2008), Naghadehi et al (2009), Bogdanovic et al (2012) and Yazdani-Chamzini, Yakchali, & Zavadskas (2012). Three DMs, experienced mining engineers, are involved in the decision process.…”
Section: Case Studymentioning
confidence: 99%
See 1 more Smart Citation
“…The evaluation process is based on 3 groups of criteria that involve 6 subcriteria. The list of criteria and sub-criteria are formed accordingly to the papers of the: Ataei et al (2008), Naghadehi et al (2009), Bogdanovic et al (2012) and Yazdani-Chamzini, Yakchali, & Zavadskas (2012). Three DMs, experienced mining engineers, are involved in the decision process.…”
Section: Case Studymentioning
confidence: 99%
“…In Table 1 we presented criteria, sub-criteria and mining methods that will be assessed. Ataei et al (2008), Naghadehi et al (2009), Bogdanovic et al (2012) and Yazdani-Chamzini et al (2012).…”
Section: Case Studymentioning
confidence: 99%
“…TOPSIS, PROMETHEE, and COPRAS methods do not require such a transformation. Qualities of the PROMETHEE method were described in (Brans & Mareschal, 2005;Tzeng & Huang, 2011;Podvezko & Podviezko, 2010; while qualities of the COPRAS method were presented in (Zavadskas et al, 2012a,b;Podvezko, 2011;Sliogeriene et al, 2012;Antucheviciene et al, (2012;Razavi Hajiagha et al, 2013;Alimardani et al, 2013;Dadelo et al, 2013;Fouladgar et al, 2012a,b;Tamosaitiene & Gaudutis, 2013;Yazdani-Chamzini et al, 2012;Barysiene, 2012;Siozinyte & Antucheviciene, 2013). Qualities of the TOPSIS method described below determined choosing this method for the absolute evaluation.…”
Section: Introductionmentioning
confidence: 99%
“…Zhao [19] proposed a hybrid MCDM Method for sustainability to selected green supplier of thermal power equipment. An Integrated MCDM Model was used to select mining method in presence of uncertainty with FAHP and FTOPSIS [20]. A fuzzy ISM (Fuzzy Interpretive Structural Modelling) with AHP and fuzzy PROMETHEE (Preference Ranking Organization Method for Enrichment Evaluation) was used to build the interdependence of supply chain complexity management [21].…”
Section: Of 13mentioning
confidence: 99%