Unit modular in-fill construction method for high-rise buildings

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
19
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 45 publications
(22 citation statements)
references
References 5 publications
0
19
0
Order By: Relevance
“…Therefore, information from the participants, such as unit production and onsite work manager, should be included and applied to the related design steps [18]. However, using conventional stick-built construction design processes for integrating the participants may also lead to rework in itself, although there may be no errors in the design [18,24]. This is because the stick-built design processes do not suggest when/what/how the information from the other participants is applied.…”
Section: Rework In Modular Construction Projectsmentioning
confidence: 99%
See 3 more Smart Citations
“…Therefore, information from the participants, such as unit production and onsite work manager, should be included and applied to the related design steps [18]. However, using conventional stick-built construction design processes for integrating the participants may also lead to rework in itself, although there may be no errors in the design [18,24]. This is because the stick-built design processes do not suggest when/what/how the information from the other participants is applied.…”
Section: Rework In Modular Construction Projectsmentioning
confidence: 99%
“…For example, if a modular building structure is designed using the stick-built construction process, and the deformation of units during lifting is not considered in the design, damage to internal or external finishes caused by deformation may occur because the self-load increases during lifting. The damaged finish would need to be reworked onsite [24].…”
Section: Rework In Modular Construction Projectsmentioning
confidence: 99%
See 2 more Smart Citations
“…Modular building system is a highly prefabricated system . The box‐type 3D modules can be conveniently positioned and interconnected on site.…”
Section: Introductionmentioning
confidence: 99%