“…B. M. grouped all SC performances into the three groups: the performance resources, outputs and flexibility. Respecting the requirements of ISO 9001: 2008 and the results of good practice in (Nestic, Djordjevic, Puskaric, Zahar Djordjevic, Tadic, & Stefanovic, 2015;Tadić, Đorđević, Erić, Stefanović, & Nestić, 2017), the production SC performances are defined. In the paper (Ramesh & Kodali, 2012), the results obtained from the numerous literary sources were summarized, and a list of performances for the lean production SC was proposed.…”