2021
DOI: 10.1108/ci-02-2021-0015
|View full text |Cite
|
Sign up to set email alerts
|

Trends and developments of on-site crane layout planning 1983–2020: bibliometric, scientometric and qualitative analyses

Abstract: Purpose This study aims to thoroughly examine the trends and developments of crane layout planning (CLP) in the construction field and reveal future research directions for modular integrated construction (MiC). Design/methodology/approach Through a rigorous systematic mixed-review methodology that integrates bibliometric, scientometric and qualitative analysis, this study explored the crane layout research trend; the scientometric analysis of journal sources and keywords occurrence network; the research con… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
5
2

Relationship

1
6

Authors

Journals

citations
Cited by 13 publications
(3 citation statements)
references
References 81 publications
0
3
0
Order By: Relevance
“…Although AI and Machine learning seem to be discussed most frequently, their application in comparison find applications in CI to the extent other industries embraced them to improve business process efficiency and enhance decision-making. For instance, using AI for autonomous crane operating, can be developed to optimise site logistics and site operations for modular construction (Tariq et al , 2021). Future research may prove its applicability for using the data from the construction sites during the construction process.…”
Section: Findings and Discussionmentioning
confidence: 99%
“…Although AI and Machine learning seem to be discussed most frequently, their application in comparison find applications in CI to the extent other industries embraced them to improve business process efficiency and enhance decision-making. For instance, using AI for autonomous crane operating, can be developed to optimise site logistics and site operations for modular construction (Tariq et al , 2021). Future research may prove its applicability for using the data from the construction sites during the construction process.…”
Section: Findings and Discussionmentioning
confidence: 99%
“…These objectives can be applied using a systematic review method [42,43]. This method consists of two main steps: the extraction of related studies and their analysis [44]. The first step starts by selecting a number of relevant keywords for the database search.…”
Section: Literature Review Of Simulation-optimization (So) In the Con...mentioning
confidence: 99%
“…Fourthly, a local search is implemented by generating a solution around the best solution using Equations ( 39) and (40). Fifthly, the fitness value of the new solutions is calculated, and the parameters of the NBA are updated according to Equations ( 41)- (44). Finally, the previous steps are iterated until the satisfaction of the stopping criteria.…”
Section: Grey Wolf Optimization (Gwo) Algorithmmentioning
confidence: 99%