2013
DOI: 10.1016/j.nimb.2013.06.036
|View full text |Cite
|
Sign up to set email alerts
|

Towards commissioning the new IGISOL-4 facility

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
80
0

Year Published

2013
2013
2023
2023

Publication Types

Select...
5
3
2

Relationship

5
5

Authors

Journals

citations
Cited by 120 publications
(88 citation statements)
references
References 18 publications
(8 reference statements)
0
80
0
Order By: Relevance
“…We carried out the Q EC -value measurements at the accelerator laboratory of the University of Jyväskylä, Finland, using the IGISOL radioactive-ion-beam production facility [3] combined with the JYFLTRAP Penning-trap mass separator/spectrometer [4,5].…”
Section: Experimental Methodsmentioning
confidence: 99%
“…We carried out the Q EC -value measurements at the accelerator laboratory of the University of Jyväskylä, Finland, using the IGISOL radioactive-ion-beam production facility [3] combined with the JYFLTRAP Penning-trap mass separator/spectrometer [4,5].…”
Section: Experimental Methodsmentioning
confidence: 99%
“…Measurements of fission products of interest were performed with beams provided by the mass separator of the upgraded IGISOL IV facility [14] (Jyväskylä, Finland). Nuclear species were produced by protoninduced fission on a natural uranium target.…”
Section: Methodsmentioning
confidence: 99%
“…The new construction of the IGISOL facility at JYFL [13] gives the opportunity to distribute separated beams between different setups. After the electrostatic switchyard the beam can be send towards JYFLTRAP or it can be directed to the γ-spectroscopy setup.…”
Section: Experimental Methodsmentioning
confidence: 99%