2021
DOI: 10.3390/buildings11050196
|View full text |Cite
|
Sign up to set email alerts
|

Toward BIM and LPS Data Integration for Lean Site Project Management: A State-of-the-Art Review and Recommendations

Abstract: Over recent years, the independent adoption of lean construction and building information modeling (BIM) has shown improvements in construction industry efficiency. Because these approaches have overlapping concepts, it is thought that their synergistic adoption can bring many more benefits. Today, implementing the lean–BIM theoretical framework is still challenging for many companies. This paper conducts a comprehensive review with the intent to identify prevailing interconnected lean and BIM areas. To this e… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
10
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8
1
1

Relationship

1
9

Authors

Journals

citations
Cited by 30 publications
(18 citation statements)
references
References 32 publications
0
10
0
Order By: Relevance
“…Li et al (2021a,b), designed a framework for a blockchain-and IoT-based smart product-service system tailored for prefabricated construction and off-site manufacturing. Sbiti et al (2021) conceptualized a blockchain-streamlined information transaction within a framework integrating BIM and LPS. Finally, Bolpagni et al (2022) mentioned that blockchain properties can be integrated with LC principles to aid nonlinear project management and integrated project delivery.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Li et al (2021a,b), designed a framework for a blockchain-and IoT-based smart product-service system tailored for prefabricated construction and off-site manufacturing. Sbiti et al (2021) conceptualized a blockchain-streamlined information transaction within a framework integrating BIM and LPS. Finally, Bolpagni et al (2022) mentioned that blockchain properties can be integrated with LC principles to aid nonlinear project management and integrated project delivery.…”
Section: Literature Reviewmentioning
confidence: 99%
“…, 2006); the implementation of situation-based management approaches such as Last Planner (Bertelsen, 2005; Maraqa et al. , 2021; Sbiti et al. , 2021; Schimanski et al.…”
Section: Literature Reviewmentioning
confidence: 99%
“…So far, no tools have been developed to support the strategic management of human resources. However, the quality of management decisions at the tactical and operational planning level can be improved with dedicated optimization methods and computerized decision support systems [39][40][41][42][43][44].…”
Section: Manpower Planning and The Construction Enterprisementioning
confidence: 99%