2020
DOI: 10.26730/2587-5574-2020-1-66-74
|View full text |Cite
|
Sign up to set email alerts
|

To the Issue of Industrial Mineral Deposit Evaluation

Abstract: Технический университет в г. Кошице, Республика Словакия Информация о статьеПринята 05 февраля 2020 г.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
4
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(5 citation statements)
references
References 1 publication
1
4
0
Order By: Relevance
“…It reduces the costs of prospecting and exploring new deposits, frees up wasteland, and eliminates sources of environmental pollution. The study results of the development trends of the mineral resource base coincide with the results of studies of experts [15][16][17][18][19][20][21][22][23][24][25][26][27][28][29][30][31][32][33][34].…”
Section: Resultssupporting
confidence: 70%
“…It reduces the costs of prospecting and exploring new deposits, frees up wasteland, and eliminates sources of environmental pollution. The study results of the development trends of the mineral resource base coincide with the results of studies of experts [15][16][17][18][19][20][21][22][23][24][25][26][27][28][29][30][31][32][33][34].…”
Section: Resultssupporting
confidence: 70%
“…Mining studies connect geology with the industrial world technically, economically, financially, and provides suitable information before verifying actual deposit [2][3][4][5][6][7]. The scheme of connection between geological and mining work in an industrial mineral deposit is shown on Fig.…”
Section: Position Of Mining Studies and Projects In The Process Of Deposits Evaluationmentioning
confidence: 99%
“…When calculating reserves it is extremely important to quantify an error (of both quantity and quality), which affects not only a category of reserves, but mainly the accuracy of subsequent technical and economic assessments. If output economic and financial information is required to maintain  5 -10 % accuracy for a detailed feasibility study, also the accuracy of reserve calculation (both quantity and quality) must meet these requirements [4].…”
Section: Materials and Methods / материалы и методыmentioning
confidence: 99%