Time-cost-quality-risk trade-off in GIGA projects using specific techniques of hunting dolphins

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Paryzad and Pour [12] have balanced the project's risk, quality, time, and cost with the help of the dolphin technique. is paper presents the dolphin group hunting algorithm as a new evolutionary optimization method.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Paryzad and Pour [12] have balanced the project's risk, quality, time, and cost with the help of the dolphin technique. is paper presents the dolphin group hunting algorithm as a new evolutionary optimization method.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Limitations (7) to (15) calculate the project's critical time and allocate the appropriate start and end time for each activity for each project. Limitations ( 8) and ( 9) indicate FS relationships, limits (10) and (11) indicate SS relationships, limits (12) and ( 13) indicate FF relationships, and limitations ( 14) and (15) indicate SF relationships between activities. Limitations ( 16) and (17) also determine the range of decision variables.…”
Section: Decision Variablesmentioning
confidence: 99%