2020
DOI: 10.1088/1757-899x/937/1/012002
|View full text |Cite
|
Sign up to set email alerts
|

Three-Level Topology for Shunt Active Power Filters

Abstract: The development in the field of power electronics has led to its optimum and efficient use in domestic and industrial arena especially in control and automation processes. In turn this has created a threat in terms of power quality issues. To some extent solution to power quality issues is obtained again using power electronic devices in the form of active filtering. A shunt active power filter (SAPF) is used for harmonic filtering. The performance of such system is enhanced by using multilevel inverters. A no… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 26 publications
0
1
0
Order By: Relevance
“…The energy the executives framework can take contributions from siphons like voltage, current, recurrence, running hours, ideal showing hours to no heap current by presenting Multi-work meter for every heap [10]. Plan of burden Sharing Running long stretches of electrical burdens area unit equally shared by the pre-characterized showing hours to programmable clocks within the energy the executives PLC and transformation naturally to the backup siphons on ending of prede ned programmable clocks to ensure equivalent showing long stretches of obligation and stay to siphons [11].…”
Section: Energy Administrationmentioning
confidence: 99%
“…The energy the executives framework can take contributions from siphons like voltage, current, recurrence, running hours, ideal showing hours to no heap current by presenting Multi-work meter for every heap [10]. Plan of burden Sharing Running long stretches of electrical burdens area unit equally shared by the pre-characterized showing hours to programmable clocks within the energy the executives PLC and transformation naturally to the backup siphons on ending of prede ned programmable clocks to ensure equivalent showing long stretches of obligation and stay to siphons [11].…”
Section: Energy Administrationmentioning
confidence: 99%