2002
DOI: 10.1109/mper.2002.4312477
|View full text |Cite
|
Sign up to set email alerts
|

Theoretical and Experimental Analyses of Photovoltaic Systems with Voltage and Current-Based Maximum Power Point Tracking

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

1
176
0
3

Year Published

2006
2006
2020
2020

Publication Types

Select...
8
1
1

Relationship

0
10

Authors

Journals

citations
Cited by 251 publications
(180 citation statements)
references
References 9 publications
1
176
0
3
Order By: Relevance
“…Also an automatic voltage regulation (AVR) function is employed for dc/ac inverters. Because the 120Hz ripple current perturbs the operating points of solar cells, it degrades the MPPT function of a PV PCS and therefore, decreases the MPPT efficiency along with the entire PCS operation efficiency [6], [7]. Therefore, the proposed control method can increase the operation efficiency.…”
Section: Introductionmentioning
confidence: 99%
“…Also an automatic voltage regulation (AVR) function is employed for dc/ac inverters. Because the 120Hz ripple current perturbs the operating points of solar cells, it degrades the MPPT function of a PV PCS and therefore, decreases the MPPT efficiency along with the entire PCS operation efficiency [6], [7]. Therefore, the proposed control method can increase the operation efficiency.…”
Section: Introductionmentioning
confidence: 99%
“…Fuchs & Masoum, 2011). Example #3: Design of a P AC =5.61 kW PV power plant for a residence A PV power plant consists of solar array, peak (maximum)-power tracker (Masoum et al, 2002;Masoum et al, 2004a), a step-up/step-down DC-to-DC converter, a deep-cycle battery for part f) only, a single-phase inverter, single-phase transformer, and residence which requires a maximum inverter AC output power of max inv P =5.61 kW as shown in Fig. 8.…”
Section: Intermittently Operating Renewable Plantsmentioning
confidence: 99%
“…On the other hand, large perturbation step size increases the steady state oscillations. Hence to improve the performance of P&O, a variable perturbation step size was utilized (Masoum, Dehbonei, & Fuchs, 2002;Femia, Granozio, Petrone, Spagnuolo, & Vitelli, 2007;Pandey, Dasgupta, & Mukerjee, 2008).…”
Section: Introductionmentioning
confidence: 99%