21st Design Automation Conference Proceedings 1984
DOI: 10.1109/dac.1984.1585766
|View full text |Cite
|
Sign up to set email alerts
|

The Second Generation MOTIS Mixed-Mode Simulator

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

1985
1985
2001
2001

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 42 publications
(3 citation statements)
references
References 7 publications
0
3
0
Order By: Relevance
“…Among logic level simulators, the RC switch-level model has been widely adopted since the model uniformly represents MOS device circuits well and may predict the circuit delay time with acceptable accuracy. Also according to Tsao [07], simulation modes can be classified as unit-delay mode, multiple-delay mode [09], timing mode [10] and the mixture of these modes [11].…”
Section: Historicalmentioning
confidence: 99%
“…Among logic level simulators, the RC switch-level model has been widely adopted since the model uniformly represents MOS device circuits well and may predict the circuit delay time with acceptable accuracy. Also according to Tsao [07], simulation modes can be classified as unit-delay mode, multiple-delay mode [09], timing mode [10] and the mixture of these modes [11].…”
Section: Historicalmentioning
confidence: 99%
“…Using a tit order integration algorithm, the node voltages at the next time point can be computed as Vc(fn+l) = vc(~n) +~c(ln)Atn + 1 (10) here Atn+l = t"+, -tn. If the approximate voltage slopes vc(tn) is used instead of tic(tn) asobtained by the exact inversion of the C matrix, then the node voltages will becomẽ c(tn+l) = Vc(fn)+ ;C(In)Afn + ,…”
Section: Thenmentioning
confidence: 99%
“…A node may, however, change voltage without a change of logic value; when this happens, an "event" is recognized provided that the voltage change is at least .4V. This primarily logic-driven scheduling distinguishes VTIsim from more accurate incremental simulators, such ss the original MOTIS [3,4], which schedule evaluations based on time or voltage increments.…”
Section: Schedulingmentioning
confidence: 99%