2012
DOI: 10.1016/j.procir.2012.07.041
|View full text |Cite
|
Sign up to set email alerts
|

The Role of Randomness of a Manual Assembly Line with Walking Workers on Model Validation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
12
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(12 citation statements)
references
References 26 publications
0
12
0
Order By: Relevance
“…Defence Support Services are characterised by a stochastic operating environment and featured by uncertainty, variability and randomness which needs to be modelled and added to the final model of the system. Examples of these features are human variability, failures of machines and quality failures, variance in cycle times, variance in the skills of the operators and finally fatigue effects on worker performance (Al-Zuheri et al, 2012). Uncertainty refers to a "lack of knowledge" a sort of "human ambiguity" which implies a risk.…”
Section: Compactedeness Of Technologymentioning
confidence: 99%
“…Defence Support Services are characterised by a stochastic operating environment and featured by uncertainty, variability and randomness which needs to be modelled and added to the final model of the system. Examples of these features are human variability, failures of machines and quality failures, variance in cycle times, variance in the skills of the operators and finally fatigue effects on worker performance (Al-Zuheri et al, 2012). Uncertainty refers to a "lack of knowledge" a sort of "human ambiguity" which implies a risk.…”
Section: Compactedeness Of Technologymentioning
confidence: 99%
“…& WW system analysis and optimization. [25] identify the levels of process parameters that entail the improvements on both productivity and ergonomics. Other studies of the same authors develop mathematical models considering the structural variables of WW for its optimization, with stochastic task times [26] and a mixed model production [27,28] illustrate the influence of workers' variability and different patterns of imbalances in output, while [29] provides a work-sharing protocol that considers discrete tasks and worker crossovers.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The 3-step productivity is applied in a mobile phone package industry. Single stage parallel line' and Five stage serial line 'configurations are produced and simulated using Witness simulation software [9]. The tools and system adopted in designing a manufacturing unit for ergonomics and time optimization in a Railway coach manufacturing scenario is designed into 3 phases, assembly line sequencing using Delima Quest software, an index to evaluate designs and flow value analysis, workplace assembly and ergonomics analysis using human modelling software Jack5.0, find bottlenecks, JIT, in current network, make improvements either in 'arrangement of work stations 'along line production or in complete product utilization [8].…”
Section: Related Workmentioning
confidence: 99%
“…11.Situational analysis of WWAL using appropriate software to enhance optimization results. Simulational analysis helps us achieve desired precise results [9].…”
Section: Process Parameters For Conversion Of Fwal Into Wwalmentioning
confidence: 99%