2016
DOI: 10.1016/j.ijproman.2015.10.006
|View full text |Cite
|
Sign up to set email alerts
|

The Project-space Model: Visualising the enablers and constraints for a given project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
12
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 12 publications
(12 citation statements)
references
References 38 publications
0
12
0
Order By: Relevance
“…Hoorn (2016) points out that there is a CSF set specific to each type of organization, varying the CSF importance in each project lifecycle phase; thus, the set of CSF is dynamic. For this reason, scholars investigating the success of factors in different projects, concluded that the factors are not universal and that they are subject to the specific project type.…”
Section: Critical Success Factorsmentioning
confidence: 99%
“…Hoorn (2016) points out that there is a CSF set specific to each type of organization, varying the CSF importance in each project lifecycle phase; thus, the set of CSF is dynamic. For this reason, scholars investigating the success of factors in different projects, concluded that the factors are not universal and that they are subject to the specific project type.…”
Section: Critical Success Factorsmentioning
confidence: 99%
“…The project-space model (refer Figure 1 for generic example) is proposed as a tool that enables a holistic perspective of a project’s progress to be captured (van der Hoorn, 2016). The tool draws out the enablers and constraints to a project’s progress and presents these in a visual format to support stakeholder understanding of project status and to inform decision making (van der Hoorn, 2016). Detailed information regarding the tool can be found in van der Hoorn (2016).…”
Section: Introductionmentioning
confidence: 99%
“…The tool draws out the enablers and constraints to a project’s progress and presents these in a visual format to support stakeholder understanding of project status and to inform decision making (van der Hoorn, 2016). Detailed information regarding the tool can be found in van der Hoorn (2016).…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations