2010
DOI: 10.2298/gsgd1003189p
|View full text |Cite
|
Sign up to set email alerts
|

The influence of water resources on transformation of spatial-functional structure of the territory of the municipality of Mali Zvornik and the possibilities for the construction of new hydro power plants

Abstract: The territory of the municipality of Mali Zvornik is, from the aspect of morphology and spatial-functional structure, a heterogeneous area. It is located in the valley of the Drina River and in hilly-mountainous part of Podrinjske mountains. The area of the municipality is 184 km², with 14076 inhabitants (2002). The importance of water resources for the development of the municipality, particularly of the hydropower plant (HPP) “Zvornik”, is analyzed in this paper. Inadequate use of hydro-energetic poten… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2017
2017
2019
2019

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…Hydroelectric power plant was built in the period 1948-1955(Golić & Joksimović, 2013. HPP "Zvornik" is the most important economic facility in the Мunicipality of Mali Zvornik, which at the beginning of the 21st century is the holder of the economic development of the municipality (Pavlović, Golić & Šabić, 2010).…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Hydroelectric power plant was built in the period 1948-1955(Golić & Joksimović, 2013. HPP "Zvornik" is the most important economic facility in the Мunicipality of Mali Zvornik, which at the beginning of the 21st century is the holder of the economic development of the municipality (Pavlović, Golić & Šabić, 2010).…”
Section: Introductionmentioning
confidence: 99%
“…Mali Zvornik suffered the biggest morphological and functional changes. The development of this settlement is closely connected with the construction of HPP "Zvornik", because the old settlement was demolished and new one was formed (Pavlović et al, 2010). Residents were displaced to a new settlement downstream of the dam or to Zvornik, while some got land and houses in other places and moved away.…”
Section: Introductionmentioning
confidence: 99%