2016
DOI: 10.3103/s000510551603002x
|View full text |Cite
|
Sign up to set email alerts
|

The foundations of modeling management processes for innovation projects in production-economics systems

Abstract: The article describes a criteria-based approach to calculate the total risk obtained by the use of forecasts in prognostic models in order to solve tasks in production-and-economic systems; this chapter also outlines the difficulty of recording risks received by the use of prognostic functions and values in mathematical operations and by applying the set of prognostic functions and values with various risk values.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
4
2
2

Relationship

0
8

Authors

Journals

citations
Cited by 9 publications
(6 citation statements)
references
References 5 publications
0
6
0
Order By: Relevance
“…[7] as crucial points in decision-making helps to avoid infinite-horizon problems [22] and exclude innovative regression in PES introduced by the corresponding member of RAS D.A. Novikov [23].…”
Section: Resultsmentioning
confidence: 99%
“…[7] as crucial points in decision-making helps to avoid infinite-horizon problems [22] and exclude innovative regression in PES introduced by the corresponding member of RAS D.A. Novikov [23].…”
Section: Resultsmentioning
confidence: 99%
“…We can estimate decision points if a set of controlled parameters is known (according to the stages and specifics of the characteristics change), and the additional information on the PS properties that we control (equipment maintenance periods, internal production cycles, etc.) (Faizrakhmanov and Mylnikov, 2016).…”
Section: Methodsmentioning
confidence: 99%
“…These curves have progress phases; except that, production-and-economic systems also have internal cycles. Shift points from one phase to another phase together with the points that indicate the end and the start of internal cycles of production-and-economic system generate multiple points for decision making [6].…”
Section: Discussionmentioning
confidence: 99%
“…Such tasks comprise the tasks for volume scheduling in production planning of goods, procurement planning of components and parts, expected demand-based pricing etc. (depending on the applied methods and the phase of project or system implementation as well as parameters and indexes used to take managerial decisions) [6]). Such tasks particularly require the use of criteria-based methods and prognostic data with criteria functions and time parameter restrictions.…”
Section: Introductionmentioning
confidence: 99%