2011
DOI: 10.2749/101686611x13131377725569
|View full text |Cite
|
Sign up to set email alerts
|

The Arch Loading of the Third Millennium Bridge at Zaragoza, Spain

Abstract: The deck, made of 60 MPa white concrete, accommodates six traffic lanes, two bicycle paths, totalizing the central 31 m width, and two wide walkways, which take the total width up to almost 43 m. At the joining section of the arch and deck, the deck width reaches locally a maximum of 68 m.All four legs of the arch are monolithically fixed to the deck; the deck also has a lower abacus fixed to it, which acts as a pier head for the substructure to transmit vertical loads from the arch and deck to the pier and fo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
1

Year Published

2021
2021
2021
2021

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
0
0
1
Order By: Relevance
“…Proyecto de Juan José Arenas, el puente está enmarcado dentro de las obras realizadas para la Expo del agua de Zaragoza (España), nalizándose su construcción en el año 2008. La estructura cruza el río Ebro, conectando las calles Pablo Ruiz Picasso y Pablo Gargallo, lo que permite comunicar los barrios del Actur y La Almozara (véanse Arenas et al [4], [5], [6] y Menéndez-Pidal et al [66]).…”
Section: Puente Del Tercer Mileniounclassified
“…Proyecto de Juan José Arenas, el puente está enmarcado dentro de las obras realizadas para la Expo del agua de Zaragoza (España), nalizándose su construcción en el año 2008. La estructura cruza el río Ebro, conectando las calles Pablo Ruiz Picasso y Pablo Gargallo, lo que permite comunicar los barrios del Actur y La Almozara (véanse Arenas et al [4], [5], [6] y Menéndez-Pidal et al [66]).…”
Section: Puente Del Tercer Mileniounclassified