IEEE Nuclear Science Symposium Conference Record, 2005
DOI: 10.1109/nssmic.2005.1596321
|View full text |Cite
|
Sign up to set email alerts
|

The AMSRW Board for the Silicon Vertex Tracker Upgrade at CDF

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…To do that we need to develop a new hardware path connecting the L1 CAL directly to the L2 decision CPU (See Figure 3). This new hardware path is based on the Pulsar boards [2], a general purpose VME board developed at CDF and used for upgrading both the Level-2 global decision crate [3] and the Level-2 silicon vertex tracking (SVT) subsystem [4]. With a such new system the full resolution calorimeter trigger tower data are received, preprocessed and merged by a set of Pulsar boards before being sent to the Level-2 decision CPU running a new fixed-cone cluster finding.…”
Section: L2 Calorimeter Trigger Upgradementioning
confidence: 99%
“…To do that we need to develop a new hardware path connecting the L1 CAL directly to the L2 decision CPU (See Figure 3). This new hardware path is based on the Pulsar boards [2], a general purpose VME board developed at CDF and used for upgrading both the Level-2 global decision crate [3] and the Level-2 silicon vertex tracking (SVT) subsystem [4]. With a such new system the full resolution calorimeter trigger tower data are received, preprocessed and merged by a set of Pulsar boards before being sent to the Level-2 decision CPU running a new fixed-cone cluster finding.…”
Section: L2 Calorimeter Trigger Upgradementioning
confidence: 99%