2015
DOI: 10.1080/01490419.2015.1008711
|View full text |Cite
|
Sign up to set email alerts
|

The 2013 Ibiza Calibration Campaign of Jason-2 and SARAL Altimeters

Abstract: International audienceThis study presents the results of the 2013 Ibiza (Western Mediterranean) calibration campaign of Jason-2 and SARAL altimeters. It took place from 14 to 16 September 2013 and comprised two phases: the calibration of the GNSS (Global Navigation Satellite System) buoys to estimate the antenna height of each of them and the absolute calibration to estimate the altimeter bias (i.e., the difference of sea level measured by radar altimetry and GNSS). The first one was achieved in the Ibiza harb… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 20 publications
(15 citation statements)
references
References 25 publications
0
15
0
Order By: Relevance
“…In this study, we used the Multi-mission altimetry Processing Software (MAPS), frequently used for processing altimetry data over land and ocean (e.g., [36][37][38][39][40]), that allows a refined selection of the valid altimeter data to build time-series of water levels at a so-called virtual station. Data processing is composed of four main steps: (i) the rough delineation of the cross-section between the altimeter tracks and the rivers using Google Earth, (ii) the loading of the altimetry over the study area and the computation of the altimeter heights from the raw data contained in the GDRs, (iii) a refined selection of the valid altimetry data through visual inspection, (iv) the computation of the water level time-series as the median of the selected water levels every cycle.…”
Section: Altimetry-based Water Levelsmentioning
confidence: 99%
“…In this study, we used the Multi-mission altimetry Processing Software (MAPS), frequently used for processing altimetry data over land and ocean (e.g., [36][37][38][39][40]), that allows a refined selection of the valid altimeter data to build time-series of water levels at a so-called virtual station. Data processing is composed of four main steps: (i) the rough delineation of the cross-section between the altimeter tracks and the rivers using Google Earth, (ii) the loading of the altimetry over the study area and the computation of the altimeter heights from the raw data contained in the GDRs, (iii) a refined selection of the valid altimetry data through visual inspection, (iv) the computation of the water level time-series as the median of the selected water levels every cycle.…”
Section: Altimetry-based Water Levelsmentioning
confidence: 99%
“…Altimetry-derived heights are automatically obtained from the GDR data using the Multi-mission Altimetry Processing Software (MAPS) that is commonly used for the selection of valid altimetry data and their processing over land and ocean [18][19][20]. More details on MAPS can be found in Frappart et al [21].…”
Section: Altimetry Data Processingmentioning
confidence: 99%
“…MAPS allows a refined selection of the valid altimetry data to build several virtual stations where a SSH time series over the Remote Sens. 2018, 10, 93 8 of 22 ocean [39] or water levels over rivers and estuaries [38,40,41] can be constructed. The altimetry-based SSH were automatically computed along the track by MAPS at a 20-Hz frequency rate (i.e.,~0.35 km along the track) for Envisat, ERS-2, Jason-1, and Jason-2, and at 40 Hz (i.e.,~0.18 km along the track) for SARAL.…”
Section: Ssh Processing and Editingmentioning
confidence: 99%