Proceedings of the ISES Solar World Congress 2011 2011
DOI: 10.18086/swc.2011.10.08
|View full text |Cite
|
Sign up to set email alerts
|

Testing of Compliance with Grid Code Requirements in IWES-SysTec Test Centre

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…For those tests, a decoupling of the device from the grid needs to be arranged to avoid interferences and irregular conditions of other MEC units in the same grid. There are several solutions for having such testing devices build in standard containers for wind turbines and large photovoltaic generators, which can be brought close to the unit to be tested with standard transporters (see [30] and [31] for examples). In case of offshore MEC units, including offshore wind turbines, new approaches with respect to the logistics need to be investigated.…”
Section: Test Procedures and Standardsmentioning
confidence: 99%
“…For those tests, a decoupling of the device from the grid needs to be arranged to avoid interferences and irregular conditions of other MEC units in the same grid. There are several solutions for having such testing devices build in standard containers for wind turbines and large photovoltaic generators, which can be brought close to the unit to be tested with standard transporters (see [30] and [31] for examples). In case of offshore MEC units, including offshore wind turbines, new approaches with respect to the logistics need to be investigated.…”
Section: Test Procedures and Standardsmentioning
confidence: 99%