2019
DOI: 10.5846/stxb201905291118
|View full text |Cite
|
Sign up to set email alerts
|

Technological model and benefit pre-evaluation of eco-environmental rehabilitation engineering of typical mines in the Nanling area of Northern Guangdong Province under the pilot framework of the eco-restoration of mountains-rivers-forests-farmlands-lakes-grasslands

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Various models and methods are used in the study of TER engineering to evaluate the ecological service value and benefits that TER projects provide [25][26][27][28][29][30]. These tools include the ordered probit model, ecological benefit evaluation model, social-ecological system framework, market value method, alternative engineering method, carbon tax law, and industrial oxygen production method.…”
Section: Introductionmentioning
confidence: 99%
“…Various models and methods are used in the study of TER engineering to evaluate the ecological service value and benefits that TER projects provide [25][26][27][28][29][30]. These tools include the ordered probit model, ecological benefit evaluation model, social-ecological system framework, market value method, alternative engineering method, carbon tax law, and industrial oxygen production method.…”
Section: Introductionmentioning
confidence: 99%