2017
DOI: 10.1016/j.csite.2017.05.008
|View full text |Cite
|
Sign up to set email alerts
|

Techno-economic feasibility analysis of 1 MW photovoltaic grid connected system in Oman

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
40
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
6
1

Relationship

2
5

Authors

Journals

citations
Cited by 101 publications
(41 citation statements)
references
References 28 publications
1
40
0
Order By: Relevance
“…It is important to have high converter efficiency. The efficiency of the converter is given by the following expression: ηconv=Pin_conv()tPloss()tPin_conv()t …”
Section: Basic Mathematical Modeling Of System Componentsmentioning
confidence: 99%
“…It is important to have high converter efficiency. The efficiency of the converter is given by the following expression: ηconv=Pin_conv()tPloss()tPin_conv()t …”
Section: Basic Mathematical Modeling Of System Componentsmentioning
confidence: 99%
“…Several research groups from variable countries (Turkey, 6 Spain, 7 United Arab Emirates (UAE), 8 Oman, 9 and Kuwait 10,11 ) conducted an economic, technical evaluation of a PV system connected to the network. The researchers presented an analytical presentation of weather data for the area where the system has been constructed.…”
Section: Introductionmentioning
confidence: 99%
“…Mandal and Panja [7] considered a 1 kWp (kilowatt peak) small scale grid connected solar photovoltaic system to evaluate the feasibility of rooftop solar photovoltaic system for School of Energy Studies Building at Jadavpur University, Kolkata, India. Kazem et al [8] investigated the optimal configuration for a 1 MW grid connected solar photovoltaic plant in Adam City, Oman. A viability analysis of three small photovoltaic systems located in different cities of Peru was discussed by Espinoza et al [9].…”
Section: Introductionmentioning
confidence: 99%