Techno-economic evaluation of grid connected PV system for households with feed in tariff and time of day tariff regulation in New Delhi – A sustainable approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
38
0
3

Year Published

2017
2017
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 107 publications
(41 citation statements)
references
References 57 publications
0
38
0
3
Order By: Relevance
“…These features are categorized into four categories, prefeasibility (eg, RETScreen), open architecture (eg, TRNSYS), simulation (eg, HYBRID2), and techno-economic and optimization (eg, HOMER). 29,38 The prefeasibility study tool, RETScreen, compares the conventional and renewable energy generation projects from the cost and benefits point of view. However, this tool lacks a function for optimization.…”
Section: Simulation Toolsmentioning
confidence: 99%
See 1 more Smart Citation
“…These features are categorized into four categories, prefeasibility (eg, RETScreen), open architecture (eg, TRNSYS), simulation (eg, HYBRID2), and techno-economic and optimization (eg, HOMER). 29,38 The prefeasibility study tool, RETScreen, compares the conventional and renewable energy generation projects from the cost and benefits point of view. However, this tool lacks a function for optimization.…”
Section: Simulation Toolsmentioning
confidence: 99%
“…Their results revealed that the grid-connected PV system was highly feasible by PV array costs of 1120 $/kW or less. In, 29 the feasibility of the grid-tied PV system for three buildings in New Delhi, India, was evaluated by using HOMER. It was showed that battery-less grid-connected PV systems were technically and economically favorable.…”
Section: Introductionmentioning
confidence: 99%
“…The total NPC of a system is the present cost of the entire system over its lifetime, subtracting revenues. That includes capital, replacement, O&M and fuel costs [66,111].…”
Section: Energy System Modelmentioning
confidence: 99%
“…From the angle of the PV development trend around the world, the PV-generation resources, technologies, policies and environmental influences were summarized comprehensively [14][15][16][17]. Especially in the case of real-life PV projects, the techno-economic and whole life-cycle evaluation methods were adopted in order to assess economic performance [18][19][20][21]. Economic assessment results can provide key indexes for the core abilities evaluation of distributed PV-generation projects.…”
Section: Literature Reviewsmentioning
confidence: 99%
“…As shown in Table 1, the index lists are selected from the literature which filters out an initial index range for core abilities evaluation of distributed PV-generation projects. [14], Vivek Tomar [19] and Sandip Ravi Kumar, et al [28] showed that technical factors may determine the PV development level, such as grid-connection. [32] figured that the output features are the basic drivers for PV power generation.…”
Section: Literature Reviewsmentioning
confidence: 99%