“…During the modernization or revitalization of the railway line, the decision-maker is faced with the need to decide which way of conducting the railway traffic on the open lines is appropriate for the analysed case. A number of factors have to be taken into consideration, which influence the choice of the best solution [7,22]. During making the decision, it is necessary to remember that when conducting of trains traffic along the open line, several rules are necessary to take into account: -on the double track open line, the train traffic should be conduct on the right track, looking in the direction of the train; from this rule there are many exceptions -traffic can also be carried out on the left track when traffic control devices allow or require such a necessity, -on each track of the open line or block section in one time can be only one train, -the station inspector can send a train from a traffic post if the adjacent trail or distance is free; in addition, it must be ensured that the traffic officer in the neighbouring post does not train on the train track, -about duty of the open line station inspector is informed on the basis of the line blocking devices state or an agreement with the station inspector of the neighbouring operating control post using radio communication devices (announcing of trains), -permission on departure of the train station inspector may issue on the basis of receiving a permit from a neighbouring operating control post for the train's departure or other indications [1], -when the devices do not allow for the train departure on the open line onto the permit signal, it can be sent to a substitute signal or a written order under certain conditions, -when the line blocking devices do not work properly, carry out the traffic based on announcements by means of telephone communication.…”