Takt Production Monitoring and Control in Apartment Renovation Projects

Abstract: Construction production is steered with the help of monitoring task progressions and comparing them to the schedule. Construction monitoring is often imprecise. Especially in takt production, more detailed and systematic monitoring methods should be pursued. In takt production, production must be monitored frequently to make sure that the production follows the takt schedule. However, takt production monitoring methods have not been discussed in literature. In this study, a digital monitoring solution for takt… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 9 publications
(15 citation statements)
references
References 23 publications
(41 reference statements)
0
13
0
Order By: Relevance
“…For this reason partnering with subcontractors should be considered, where work between the parties is based on trust and long-term cooperation (Lehtovaara et al , 2020). On the other hand, takt production enables production monitoring in greater detail (Dlouhy et al , 2018; Keskiniva et al , 2021), which allows the comparison of hours worked and hours invoiced in more detail for example with digital tools.…”
Section: Resultsmentioning
confidence: 99%
“…For this reason partnering with subcontractors should be considered, where work between the parties is based on trust and long-term cooperation (Lehtovaara et al , 2020). On the other hand, takt production enables production monitoring in greater detail (Dlouhy et al , 2018; Keskiniva et al , 2021), which allows the comparison of hours worked and hours invoiced in more detail for example with digital tools.…”
Section: Resultsmentioning
confidence: 99%
“…Likewise, it was notice that there is no broader and more comprehensive work on monitoring and control of takt production, as most of the publications related to this topic are conference reports with scattered information. As was mentioned at [22], Alhava et al [26] have proposed that the collection of the takt production realization data should be carried out by the trade partners' foremen and workers with a mobile application. Data collection is recommended to be carried out by the foremen of the main contractor.…”
Section: Discussionmentioning
confidence: 99%
“…It also helps foremen to detect inaccuracies in the takt plan. For example, in the study of Keskiniva et al [22], the foreman walks the site at the end of each workday and documents the situation in a digital application. The application automatically compares records and schedules and provides analysed data for production management and production development in a user-friendly format.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations