Suggestions for takt production subcontract clauses – a conceptual study

Abstract: Purpose This study aims to provide a foundation for the development of subcontracts that suit takt production in construction. Design/methodology/approach This is a non-empiric conceptual study, which integrates takt production and general construction literature into new proposals for subcontract clauses suitable for takt production in construction. This study uses literature reviews, from which proposals regarding takt production viable subcontract clauses are conducted via logical reasoning. Findings A … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(7 citation statements)
references
References 42 publications
0
7
0
Order By: Relevance
“…Furthermore, locations may not even be available for working ahead of schedule if other trades are handing over locations at a standardized takted rate. In practice, however, such prohibition may lead to a risk of higher tenders or poor subcontractor income [46]. Further research should be undertaken on whether proceeding ahead of the takt schedule is to be avoided or not.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…Furthermore, locations may not even be available for working ahead of schedule if other trades are handing over locations at a standardized takted rate. In practice, however, such prohibition may lead to a risk of higher tenders or poor subcontractor income [46]. Further research should be undertaken on whether proceeding ahead of the takt schedule is to be avoided or not.…”
Section: Discussionmentioning
confidence: 99%
“…Regulating the handover of locations to trades steers the trades to comply with the takt schedule. In addition, subcontracts steer tasks to be completed according to the takt schedule [46]. Keskiniva et al [47] highlighted that a takt schedule should, explicitly and in detail, visualize the order of completion of work packages and individual work steps.…”
Section: Existing Non-takt Indicator 4-earned Value and Duration Perf...mentioning
confidence: 99%
“…While conducting an extensive bibliographic analysis is outside the scope of this paper, we made some overarching observations regarding who has written anything about takt handoffs. Although there are many different contributors from around the world to the general field of takt, the papers we identified regarding handoffs cluster primarily around three international communities: The American -affiliated with Berkley (Frandson et al, 2013(Frandson et al, , 2014Frandson et al, 2015;Frandson & Tommelein, 2016;Linnik et al, 2013;Salem et al, 2018;Tommelein & Emdanat, 2022), the Finnish -affiliated with Aalto University (Keskiniva et al, 2021(Keskiniva et al, , 2022Kujansuu et al, 2020;Lehtovaara et al, 2021Lehtovaara et al, , 2022 and the Norwegian affiliated with NTNU (Dahlberg & Drevland, 2021;Gardarsson et al, 2019;Haugen et al, 2020). Interestingly, while the German community behind the Takt Planning and Takt Control approach has been prolific in producing papers on takt, none of their publications directly concerned the handoff of takt areas.…”
Section: Who Has Written About Handoffs In Takt?mentioning
confidence: 99%
“…Linnik et al (2013) argue that the takt plan should specify all the activities that must be done before the handoff. Keskiniva et al (2022) investigated how contracts between main contractors and subcontractors could be adapted to takt production. One finding was that the subcontractors were incentivized not to finish in the takt areas before handoff because of how their work was compensated.…”
Section: Different Perceptions Of What Finished Takt Areas Meanmentioning
confidence: 99%
See 1 more Smart Citation