2019
DOI: 10.1016/j.tust.2019.05.016
|View full text |Cite
|
Sign up to set email alerts
|

Surface settlement of subway station construction using pile-beam-arch approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
20
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 47 publications
(20 citation statements)
references
References 28 publications
0
20
0
Order By: Relevance
“…When the PBA method is applied to excavation during subway construction, a small pilot tunnel can be excavated first, and then the soil can be excavated safely due to this initial support, which can reduce disturbance to the soil above as much as possible [7][8][9][10]. Relevant results have shown that the most important step during construction that causes settlement using the PBA method is the excavation of the pilot tunnels [11][12][13][14]. In the construction of multiple pilot tunnels, the choice of operation is the dominant factor affecting surface settlement.…”
Section: Introductionmentioning
confidence: 99%
“…When the PBA method is applied to excavation during subway construction, a small pilot tunnel can be excavated first, and then the soil can be excavated safely due to this initial support, which can reduce disturbance to the soil above as much as possible [7][8][9][10]. Relevant results have shown that the most important step during construction that causes settlement using the PBA method is the excavation of the pilot tunnels [11][12][13][14]. In the construction of multiple pilot tunnels, the choice of operation is the dominant factor affecting surface settlement.…”
Section: Introductionmentioning
confidence: 99%
“…e core idea of the PBA method is to form an overall support system composed of the lateral wall support structure and arch initial support structure to ensure sufficient safety during the excavation of the main part of the station and effectively control the settlement of the stratum. e PBA method has its unique advantages in the construction of metro stations and strong applicability to the construction environment [16,17].…”
Section: Introductionmentioning
confidence: 99%
“…Tan et al based on the Wangjing tunnel project studied the segment displacement and mechanical response of the shield tunnel with a diameter of 10.5 m in the process of shield construction and cross-passage construction [4]. Fang et al and Zhang et al calculated the seepage-induced effective stress around a tunnel in an elastic half-plane [5][6][7]. Li et al defined a parameter called the partial failure ratio to describe the range of partial failure, which they used to analyze the limit support pressure and failure zone.…”
Section: Introductionmentioning
confidence: 99%