2007
DOI: 10.1109/tpwrs.2007.901101
|View full text |Cite
|
Sign up to set email alerts
|

Supervisory Control of a Wind Farm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
44
0

Year Published

2011
2011
2018
2018

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 89 publications
(46 citation statements)
references
References 20 publications
0
44
0
Order By: Relevance
“…It makes following control possible through a series of strategies such as output power regulation by adjustment of pitch angles or start-stop procedure of wind turbines. Similar to conventional units, the performance of the wind turbines control can be evaluated quantitatively by regulating rate and response time (Qiao, et al, 2009, Hansena, et al, 2006, Lubosny, et al, 2007.…”
Section: Apdc System Considering Large-scale Wind Power Integrationmentioning
confidence: 99%
“…It makes following control possible through a series of strategies such as output power regulation by adjustment of pitch angles or start-stop procedure of wind turbines. Similar to conventional units, the performance of the wind turbines control can be evaluated quantitatively by regulating rate and response time (Qiao, et al, 2009, Hansena, et al, 2006, Lubosny, et al, 2007.…”
Section: Apdc System Considering Large-scale Wind Power Integrationmentioning
confidence: 99%
“…The ESS type selection for the wind farm is dependent on the control purposes [4]. Fast and short (or medium) term ESS can be used for power quality improvement and frequency control, while slow and long term ESS is more suitable for economic dispatch [5]. In this paper, the fast and short-term ESS unit, such as Battery, Super-capacitor, etc., is utilized in a wind farm for its fast response and the real time operation control purpose of the wind farm.…”
Section: Introductionmentioning
confidence: 99%
“…In order to reduce a negative impact of the output power fluctuation from the wind farms, the wind output power should be smoothened before delivering into the grid [6,7]. Minimization of the output power fluctuation can be realized by either controllers without additional apparatus or utilization of additional devices.…”
Section: Introductionmentioning
confidence: 99%
“…However, this control strategy affects high stresses on the turbine blades [7]. Another method to filter out the fluctuated output power is to use the external energy storage systems such as batteries, ultracapacitors, flywheels, etc [6,11,12]. With these external devices, the optimal wind energy is captured by the maximum power point tracking (MPPT) control.…”
Section: Introductionmentioning
confidence: 99%