2020
DOI: 10.1007/978-3-030-48256-5_18
|View full text |Cite
|
Sign up to set email alerts
|

Subjective Quality Evaluation of Underground BPL-PLC Voice Communication System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
4
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(4 citation statements)
references
References 12 publications
0
4
0
Order By: Relevance
“…This work is an extended version and a direct continuation of our published conference paper [21]. It summarizes many years of research conducted by the authors, hence some of the results were published early [9][10][11]21]. The content of Section 3, as well as Sections 4.1 and 4.3, has not been previously published.…”
Section: Introductionmentioning
confidence: 99%
See 3 more Smart Citations
“…This work is an extended version and a direct continuation of our published conference paper [21]. It summarizes many years of research conducted by the authors, hence some of the results were published early [9][10][11]21]. The content of Section 3, as well as Sections 4.1 and 4.3, has not been previously published.…”
Section: Introductionmentioning
confidence: 99%
“…As a result, the investment costs of the installation are significantly reduced and operator fees can be omitted. However, the disadvantages of PLC transmission include, most of all, the impact of environmental electromagnetic compatibility (EMC) disturbances, both conducted and induced, on the scope and quality of transmission [7][8][9][10][11]. In addition, PLC transmission should not interfere with the basic functions of electricity networks, such as transmission and distribution of electricity itself.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations