2018
DOI: 10.1088/1757-899x/327/4/042026
|View full text |Cite
|
Sign up to set email alerts
|

Studying quick coupler efficiency in working attachment system of single-bucket power shovel

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…In the first case, it is assumed that the bucket met an insurmountable obstacle at the exit from the face, and the condition is taken into account that at the same time all the engine power goes to lifting the boom with the handle. In the second case, the calculation is carried out when unloading sticky soil, assuming that the handle and bucket are at maximum reach [10].…”
Section: Methodsmentioning
confidence: 99%
“…In the first case, it is assumed that the bucket met an insurmountable obstacle at the exit from the face, and the condition is taken into account that at the same time all the engine power goes to lifting the boom with the handle. In the second case, the calculation is carried out when unloading sticky soil, assuming that the handle and bucket are at maximum reach [10].…”
Section: Methodsmentioning
confidence: 99%