2011 International Conference on Advanced Power System Automation and Protection 2011
DOI: 10.1109/apap.2011.6180827
|View full text |Cite
|
Sign up to set email alerts
|

Study on Travelling-wave protection Starting element

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Three-phase current signals in the frequency band of 3-10kHz can be used to form the startup element [27][28][29]. After being filtered by a band-pass filter of 3-10kHz, the three-phase current signals are compared with the start threshold, and if one of the current signals exceeds the start threshold, a start signal will be given out.…”
Section: A Startup Elementmentioning
confidence: 99%
“…Three-phase current signals in the frequency band of 3-10kHz can be used to form the startup element [27][28][29]. After being filtered by a band-pass filter of 3-10kHz, the three-phase current signals are compared with the start threshold, and if one of the current signals exceeds the start threshold, a start signal will be given out.…”
Section: A Startup Elementmentioning
confidence: 99%
“…At present, the commonly used state evaluation methods for UHV oil-immersed shunt reactors are mostly based on a certain factor or several factors to make judgments, without a comprehensive consideration of the overall operating condition information of the shunt reactors [8][9][10] . There are various uncertainties in the process of fault diagnosis and state evaluation of the shunt reactors, and the accuracy and timeliness of the diagnosis results are poor.…”
Section: Introductionmentioning
confidence: 99%