2021
DOI: 10.1038/s41598-021-00438-9
|View full text |Cite
|
Sign up to set email alerts
|

Study on timing sequence control fracture blasting excavation of deep rock masses with filled joints

Abstract: During the blasting excavation of deep underground caverns, the effects of the structural surface on crack propagation are usually considered in addition to the clamping effects of high in situ stress. Based on the notched borehole and timing sequence control (TSC) fracture blasting method, this paper studies the effects of different borehole shapes on the degree of damage of the surrounding rock and profile flatness of the rock anchor beams and the effects of different filled joint characteristics on the blas… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 43 publications
(31 reference statements)
0
0
0
Order By: Relevance