2013
DOI: 10.4028/www.scientific.net/amr.838-841.388
|View full text |Cite
|
Sign up to set email alerts
|

Study of Visual Simulation for Decomposition Assembly Tower by Derrick Supported by Inner Suspension and Inner Backstay

Abstract: Derrick supported by inner suspension and inner backstay group tower is a construction technique commonly used in the construction of overhead transmission lines, the locale sketch and construction technique are complex, and not conducive to the analysis of the key construction and improve the level of decision-making. Through analysis assembly tower construction technology of derrick supported by inner suspension and inner backstay, using engineering visualization design software 3ds Max, the establishment of… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…When the traditional transmission tower is hoisted, the most widely used is the use of suspended poles to hoist the hanger in pieces [1]. This hoisting method uses a hoisting system installed on the top of the pole to hoist the hanger, and uses the wind rope (control rope) tied at the tail of the hoisting piece to adjust the hoisting posture [2].…”
Section: Introductionmentioning
confidence: 99%
“…When the traditional transmission tower is hoisted, the most widely used is the use of suspended poles to hoist the hanger in pieces [1]. This hoisting method uses a hoisting system installed on the top of the pole to hoist the hanger, and uses the wind rope (control rope) tied at the tail of the hoisting piece to adjust the hoisting posture [2].…”
Section: Introductionmentioning
confidence: 99%