1990
DOI: 10.1021/ie00107a007
|View full text |Cite
|
Sign up to set email alerts
|

Studies in chemical process design and synthesis. 9. A unifying method for the synthesis of multicomponent separation sequences with sloppy product streams

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0

Year Published

1997
1997
2020
2020

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 21 publications
(10 citation statements)
references
References 17 publications
0
10
0
Order By: Relevance
“…Finally, the TAC is employed to evaluate each optimal solution for a given total number of trays. The TAC formula of Liu et al 27 and Douglas' costs correlations 28 according to Eq. 2 were applied.…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…Finally, the TAC is employed to evaluate each optimal solution for a given total number of trays. The TAC formula of Liu et al 27 and Douglas' costs correlations 28 according to Eq. 2 were applied.…”
Section: Resultsmentioning
confidence: 99%
“…The three design specifications, the top, side stream, and bottom compositions, are set at a purity of 99 mol % for their respective products. The optimization procedure that minimizes the OF is accomplished by first estimating the total number of stages for the first column based on the Gilliland equation and second by a similar estimation of the total number of stages for the second column 27, 28. Thirdly, the initial value of side stream flow is given based on the previously mentioned sensitivity analysis and its effluent stage.…”
Section: Problem Statement and Dwc Optimization Methodologymentioning
confidence: 99%
“…Also, the recovery factor of a HHK from the Fenske equation can be used as an upper bound on its recovery factor in the practical design (DHHKFS/BHHKFSDHHK/BHHK). Similar arguments have been used to develop heuristic rules for nonsharp splits 29‐31 …”
Section: Proposed Formulationmentioning
confidence: 99%
“…The TAC was obtained by summing the annual utility-related expenses and adding 10% (10-year payback period) of the installed equipment cost. Detailed calculations based on the research of Liu et al [37] and Douglas' cost correlations [38] were applied according to equation (2.1).…”
Section: Designmentioning
confidence: 99%