“…The cost of the original design from the paper by Miguel et al [43] was 226.5kg CO 2 e when using the unit prices as in this paper. This means for the combined load case when optimizing reinforcement only, a saving of 22.2kg CO 2 e and 3.7kg CO 2 e or 9.8% and 1.6% is obtained, for the free and material group optimization respectively.…”