2023
DOI: 10.1016/j.anucene.2022.109635
|View full text |Cite
|
Sign up to set email alerts
|

Streamlined best estimate plus uncertainty analysis of a GEN III + BWR for a bottom drain line small break LOCA

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 36 publications
0
0
0
Order By: Relevance
“…Since the 1988 amendment of the 10 CFR 50.46 rule, Best Estimate Plus Uncertainty (BEPU) methods have been approved by the Nuclear Regulatory Commission (NRC) as an alternative way for nuclear safety analysis [1]. The BEPU method has been developed internationally and become a popular nuclear safety analysis method in recent years [2][3][4]. Compared to traditional conservative analysis methods, the BEPU method uses the bestestimate nuclear simulation codes (such as RELAP5, TRACE, and MELCOR) to carry out more realistic and accurate calculations, which can bring more economic benefits on the premise of ensuring nuclear safety.…”
Section: Introductionmentioning
confidence: 99%
“…Since the 1988 amendment of the 10 CFR 50.46 rule, Best Estimate Plus Uncertainty (BEPU) methods have been approved by the Nuclear Regulatory Commission (NRC) as an alternative way for nuclear safety analysis [1]. The BEPU method has been developed internationally and become a popular nuclear safety analysis method in recent years [2][3][4]. Compared to traditional conservative analysis methods, the BEPU method uses the bestestimate nuclear simulation codes (such as RELAP5, TRACE, and MELCOR) to carry out more realistic and accurate calculations, which can bring more economic benefits on the premise of ensuring nuclear safety.…”
Section: Introductionmentioning
confidence: 99%