Stream methods of construction work organization: an introduction to the problem

Abstract: This paper presents and describes basic properties of construction work organization methods which use time couplings. In addition, fundamental methods of construction work organization, which enable the scheduling and synchronization of construction works and take into account several constraints encountered in practice, are also discussed.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
6
0

Year Published

2004
2004
2020
2020

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 7 publications
(6 citation statements)
references
References 0 publications
0
6
0
Order By: Relevance
“…This paper is a continuation of the problem, which has been described earlier in Engineering, Construction and Architectural Management by Hejducki and Mrozowicz (2001), titled “Stream methods of construction work organisation”. The earlier paper presented the foundation of construction work organisation methods, which considers time couplings.…”
Section: Introductionmentioning
confidence: 97%
See 2 more Smart Citations
“…This paper is a continuation of the problem, which has been described earlier in Engineering, Construction and Architectural Management by Hejducki and Mrozowicz (2001), titled “Stream methods of construction work organisation”. The earlier paper presented the foundation of construction work organisation methods, which considers time couplings.…”
Section: Introductionmentioning
confidence: 97%
“…A special essential contribution in the development of the above mentioned problem has been made, apart from Professor Afanasevs' team, also by: A. Melski (USA), M. Joudi (Syria), K. Fidler, J. Pialek (Germany), T. Izmajlow (The Czech Republic), G. Ortega‐Mengibura (Cuba), J. Mrozowicz (Poland) and others. Many problems have also been solved by various authors' (Hejducki, 2000; Hejducki and Mrozowicz, 1999, 2001).…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…However, if the amount of work related with a process differs zone to zone and these differences do not stay in the same proportion for each process, then the sequence of zones becomes a key factor affecting the project duration. The problem of determining the optimal order of zones was addressed, among others, by Hejducki and Mrozowicz (2001), who assumed the same sequence of zones for each process, and later by Fan and Tserng (2006) and Fan et al (2012) who applied soft logic in defining precedence relations among processes of the same type in different work zones. However, all these authors assumed that exactly the same set of processes is to be conducted in each work zone, and no process can be conducted at the same time in different work zones.…”
Section: Introductionmentioning
confidence: 99%
“…The construction scheduling methods that rest upon the flow shop algorithms come under many names, such as Stream Methods [15] and Time Coupling Methods (TCM) [16], to mention only those developed in Poland over the last few decades.…”
mentioning
confidence: 99%