2005
DOI: 10.1109/tvt.2004.842462
|View full text |Cite
|
Sign up to set email alerts
|

Stray Current Control in DC Mass Transit Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
62
0
3

Year Published

2012
2012
2022
2022

Publication Types

Select...
3
3
2

Relationship

0
8

Authors

Journals

citations
Cited by 140 publications
(65 citation statements)
references
References 3 publications
0
62
0
3
Order By: Relevance
“…Smanjenju lutajućih struja pridonosi i dobra odvodnja kolosijeka [7]. Ne pokažu li ove mjere dobre rezultate, izvodi se sustav za skupljanje lutajućih struja [8].…”
Section: Uvodunclassified
See 1 more Smart Citation
“…Smanjenju lutajućih struja pridonosi i dobra odvodnja kolosijeka [7]. Ne pokažu li ove mjere dobre rezultate, izvodi se sustav za skupljanje lutajućih struja [8].…”
Section: Uvodunclassified
“…Sustav za skupljanje lutajućih struja ''presijeca'' put strujama koje su pronašle put iz tračnice i sprječava njihov ulazak u tlo [8]. Sastoji se od čeličnih mreža koje su razdvojene na segmente duljine oko 300 m i međusobno povezane vodičem dobre električne provodljivosti (najčešće bakrom) te spojene na negativnu sabirnicu u elektrovučnoj podstanici (slika 6.).…”
Section: Sustav Za Skupljanje Lutajućih Strujaunclassified
“…The parameters used in the simulation are determined from the available line 4 characteristic data, the available standards, references [8], [11] and division of the line into equal 100 meter cells. According to the manufacturers' data, R rr is 1650 µΩ (i.e., with 5% corrosion, the resistance per unit length of the rail is 16.5 µΩm -1 .)…”
Section: Modeling the Line And Determining The Parametersmentioning
confidence: 99%
“…"Cotton" discussed the importance of stray current reduction in DC rail transit systems and proposed usage of stray current collection mats. Also, he talked about the influences of his proposed system's performance and resistivity of soil on stray currents and the resulting corrosions [8].…”
Section: Introductionmentioning
confidence: 99%
“…The track may feature different constructive characteristics depending on the type of support and infrastructure (tunnel, cut & cover, viaduct, station, etc. ), and the provisions adopted for one may not be optimized for the other [3] to [5]. Moreover, such track portions shall in principle allow separate testing, with distinct values of G re .…”
Section: Introductionmentioning
confidence: 99%