2021
DOI: 10.1016/j.jclepro.2020.123364
|View full text |Cite
|
Sign up to set email alerts
|

Stochastic multi-objective integrated disassembly-reprocessing-reassembly scheduling via fruit fly optimization algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0
6

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
2
1

Relationship

1
8

Authors

Journals

citations
Cited by 57 publications
(15 citation statements)
references
References 60 publications
0
8
0
6
Order By: Relevance
“…is intractable to accurately know the information of EOL products beforehand as a result of their various usage processes in diverse customers [46][47][48][49][50]. Therefore, we need to cope with the noise from random disturbance.…”
Section: Proposed Methodsmentioning
confidence: 99%
“…is intractable to accurately know the information of EOL products beforehand as a result of their various usage processes in diverse customers [46][47][48][49][50]. Therefore, we need to cope with the noise from random disturbance.…”
Section: Proposed Methodsmentioning
confidence: 99%
“…Also, they solved their model with a meta-heuristic called Teaching Learning Based Optimization algorithm. Fu et al (2021) presented a statistic multi-objective planning problem in three stages of disassembly, reprocessing, and reassembling simultaneously for end-of-life products. They used Fruit Fly Optimization to solve their problem.…”
Section: Disassembly and Scheduling Problemsmentioning
confidence: 99%
“…Shi et al (2020) proposed an energy-aware remanufacturing scheduling method for the entire remanufacturing system with non-dedicated reprocessing lines. Fu et al (2021) focused on a stochastic multi-objective remanufacturing scheduling problem that integrates disassembly, reprocessing, and reassembly sub-systems.…”
Section: A Job Shop Scheduling Problemmentioning
confidence: 99%