2021
DOI: 10.1080/0951192x.2021.1963484
|View full text |Cite
|
Sign up to set email alerts
|

An integrated multi-stage vehicle routing and mixed-model job-shop-type robotic disassembly sequence scheduling problem for e-waste management system

Abstract: The rapid development of technology has reduced the longevity of electronic products; this can be led to increase generation of electronic and electrical waste worldwide. The protection of the environment and the optimum use of non-renewable resources should be our priority in today's world. Therefore, e-waste management involves two crucial processes of the collection and recovery of e-waste that ought to be considered in an e-waste management. Thus, this paper presents a new integrated multi-stage model for … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
11
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
1

Relationship

2
6

Authors

Journals

citations
Cited by 29 publications
(11 citation statements)
references
References 60 publications
0
11
0
Order By: Relevance
“…According to Table 3, there are tool conflicts among Part 14, Part 18, and Part 30. The corresponding APD disassembly sequence can be expressed as K = fk 1 , k 2 , k 3 g: 32,22,23,25,36,21,35,20,34,31,19,10,12,13,11,9,38,8,30,18,40,37,14,26,16,29,24,27,28,39,7,17,2,4,3,1,5,6,15, 41…”
Section: Case Studymentioning
confidence: 99%
See 1 more Smart Citation
“…According to Table 3, there are tool conflicts among Part 14, Part 18, and Part 30. The corresponding APD disassembly sequence can be expressed as K = fk 1 , k 2 , k 3 g: 32,22,23,25,36,21,35,20,34,31,19,10,12,13,11,9,38,8,30,18,40,37,14,26,16,29,24,27,28,39,7,17,2,4,3,1,5,6,15, 41…”
Section: Case Studymentioning
confidence: 99%
“…It can be used to achieve maximum profits through systematic disassembly operation. Malekkhouyan et al 24 presented a new integrated multi-stage model for a comprehensive e-waste management system in the certain level of the product disassembly sequence scheduling. By considering the total pollution emissions, the carbon footprint by robots, and the total cost of disassembling products as the optimization objectives, the disassembly sequence scheduling was optimized.…”
Section: Introductionmentioning
confidence: 99%
“…Another recent problem related to the WCVRP is the recovery and collection of electronic and electrical equipment waste. Malekkhouyan et al [121] introduced the integrated multistage vehicle routing and mixed-model robotic disassembly sequence scheduling problem on an e-waste management system. +e problem objective is to minimize total costs of collocation and transportation, total pollution of CO 2 emissions by vehicles, the carbon footprint by robots, and the total cost of disassembling products simultaneously.…”
Section: Waste Collection-relatedmentioning
confidence: 99%
“…Pickups and deliveries-related problemsFatemi-Anaraki et al[75] Waste collection-related problems Malekkhouyan et al[121] …”
mentioning
confidence: 99%
“…Research shows that people are drawn to non-fossil fuels. Environmental protection and optimal use of non-renewable resources are the priority of societies in today's world [20]. To achieve these goals, it is necessary to minimize the use of fossil fuels in transportation.…”
mentioning
confidence: 99%