2007
DOI: 10.1109/tasc.2007.897278
|View full text |Cite
|
Sign up to set email alerts
|

Status of the Design of a Full Length Superferric Dipole and Quadrupole Magnets for the FAIR SIS 100 Synchrotron

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2007
2007
2009
2009

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…The Nuclotron ring of the JINR Dubna was the starting point for the magnet design. In the preliminary R&D stage, the main operation criteria (magnet ac loss, magnetic field quality and mechanical stability of the coil) had been physically analyzed and numerically tested [2], including finite element calculations [3]. A real accelerator magnet uses different materials for different parts.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The Nuclotron ring of the JINR Dubna was the starting point for the magnet design. In the preliminary R&D stage, the main operation criteria (magnet ac loss, magnetic field quality and mechanical stability of the coil) had been physically analyzed and numerically tested [2], including finite element calculations [3]. A real accelerator magnet uses different materials for different parts.…”
Section: Introductionmentioning
confidence: 99%
“…This work is supported by EU FP6 Design study (contract 515873 -DIRAC secondary-Beams)2 The rigidity is given by the integral dipole strength of all dipoles;…”
mentioning
confidence: 99%