2014
DOI: 10.1016/j.tifs.2014.03.010
|View full text |Cite
|
Sign up to set email alerts
|

Statistical Process Control (SPC) in the food industry – A systematic review and future research agenda

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

1
53
0
8

Year Published

2015
2015
2019
2019

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 82 publications
(70 citation statements)
references
References 65 publications
1
53
0
8
Order By: Relevance
“…Consider, for instance, several sensors observing some industrial production chain. These (potentially correlated) sensor data streams can be monitored with a statistical process control (SPC) algorithm (Lim et al, 2014;Ge et al, 2013;Lowry and Montgomery, 1995). The basic idea is to raise an alarm as soon as an anomaly according to the SPC is detected, meaning that the production chain is out of control.…”
Section: Introductionmentioning
confidence: 99%
“…Consider, for instance, several sensors observing some industrial production chain. These (potentially correlated) sensor data streams can be monitored with a statistical process control (SPC) algorithm (Lim et al, 2014;Ge et al, 2013;Lowry and Montgomery, 1995). The basic idea is to raise an alarm as soon as an anomaly according to the SPC is detected, meaning that the production chain is out of control.…”
Section: Introductionmentioning
confidence: 99%
“…These factors are prerequisites for the creation of an environment favorable for the SPC use. The CSF conduction failure may lead to issues associated with the implementation, maintenance and continuity of the program Lim et al, 2014;Rohani et al, 2010;Woodall & Montgomery, 1999).…”
Section: Identifying Csf For Spc Implementationmentioning
confidence: 99%
“…The greatest challenge is to eliminate the barriers people face when they deal with such tools. This goal can be achieved through continuous SPC training (Elg et al, 2008;Lim et al, 2014;Mason & Antony, 2000). From an organizational viewpoint, it is quite difficult to have the whole organization committed with the program, but such commitment is accomplished through top management support (Elg et al, 2008;Lim et al, 2014).…”
Section: Identifying Csf For Spc Implementationmentioning
confidence: 99%
“…Such plans can directly impact the efficiency and efficacy of the production; if these plans are poorly delineated, then they can compromise product quality and productivity (Duarte & Saraiva, 2008;Hoerl & Snee, 2010;Montgomery, 2013;Lim et al, 2014).…”
Section: Introductionmentioning
confidence: 99%
“…This may be a result of: i) cultural paradigms; ii) the types of groups used to promote and improve the field of statistical quality control, such as task force and semi-autonomous groups; iii) governance within groups (centralized or decentralized, use of specific methods or routines and monitoring of activities); and iv) understanding and applying new technics and tools in the problem identification stage and solution (Juran & Gryna, 1991;Atkinson, 1994;Chapman & Hyland, 1997;Bond, 1999;Harrison, 2000;Bechet et al, 2000;Jabnoun, 2001;Hyland et al, 2003;Jager et al, 2004;Fryer et al, 2007;Marin-Garcia et al, 2008;Mahanti & Evans, 2012;Rantamäki et al, 2013;Sharma & Kharub;Lim et al, 2014).…”
Section: Introductionmentioning
confidence: 99%