2018
DOI: 10.1080/03610926.2018.1549260
|View full text |Cite
|
Sign up to set email alerts
|

Statistical process control (SPC) for short production run with Cauchy distribution, a case study with corrected numbers approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 14 publications
0
2
0
Order By: Relevance
“…Ladany 11 first introduced optimized-p chart for short production run. Later on, numerous authors introduced effective designs for such economic process, see for instance Ladany and Bedi 12 , Del Castillo and Montgomery 7 , Del Castillo and Montgomery 8 , Tagaras 21 , Nenes and Tagaras 14 , Nenes and Tagaras 15 , Celano et al 6 , Castagliola et al 3 , Castagliola et al 2 , Amdouni et al 1 , Khatun et al 9 , Naseri et al 13 and Khoo et al 10 . This study is planned to design the Shewhart control chart for monitoring the ratio of two variables for a short production run.…”
Section: Introductionmentioning
confidence: 99%
“…Ladany 11 first introduced optimized-p chart for short production run. Later on, numerous authors introduced effective designs for such economic process, see for instance Ladany and Bedi 12 , Del Castillo and Montgomery 7 , Del Castillo and Montgomery 8 , Tagaras 21 , Nenes and Tagaras 14 , Nenes and Tagaras 15 , Celano et al 6 , Castagliola et al 3 , Castagliola et al 2 , Amdouni et al 1 , Khatun et al 9 , Naseri et al 13 and Khoo et al 10 . This study is planned to design the Shewhart control chart for monitoring the ratio of two variables for a short production run.…”
Section: Introductionmentioning
confidence: 99%
“…Improve -Process (Abdul Halim , (Egorov et al, 2017), (Solihudin & Kusumah, 2017), (Hrvačić, 2018), (Bahari et al, 2018), (Zasadzień & Midor, 2018), (Rasay et al, 2018), (Saifuddoha & Islam, 2019), (Amin & Venkatesan, 2019), (Chandrabalan et al, 2019), (Jin et al, 2019) (Wahyudin et al, 2019), (Hsu et al, 2020), (Silverstein et al, 2020), (Girma & Sahu, 2020) 30 B. Qualitative -Qualitative Analysis (Lim & Antony, 2016), (Halim Lim et al, 2017), (He & Wang, 2018), (Wiecha & Ćwikła, 2019), (Naseri et al, 2020), (Prata et al, 2020) 12…”
mentioning
confidence: 99%