2021
DOI: 10.1016/j.jmapro.2021.07.031
|View full text |Cite
|
Sign up to set email alerts
|

One-sided Shewhart control charts for monitoring the ratio of two normal variables in short production runs

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
10
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 18 publications
(11 citation statements)
references
References 29 publications
0
10
0
1
Order By: Relevance
“…Also, standard deviation of run length (SDRL), relative average run length (RARL), performance comparison index (PCI), and extra quadratic loss (EQL) are used to evaluate chart performance. To have a fair judgment, given an identical ARL in IC condition, denoted by ARL 0 , the charts try to reach the lower ARL value in OC condition, denoted by ARL 1 3–8 …”
Section: Introductionmentioning
confidence: 99%
“…Also, standard deviation of run length (SDRL), relative average run length (RARL), performance comparison index (PCI), and extra quadratic loss (EQL) are used to evaluate chart performance. To have a fair judgment, given an identical ARL in IC condition, denoted by ARL 0 , the charts try to reach the lower ARL value in OC condition, denoted by ARL 1 3–8 …”
Section: Introductionmentioning
confidence: 99%
“…However, these machines suffer from low power factor and torque density as compared to PMVM. The statorconnected DC-VRM is also free from the PMs [9]- [12]. Because of its high reliability, this machine is gaining more attention due to which it is being used in high-speed applications.…”
Section: Introductionmentioning
confidence: 99%
“…evaluated the effects of measurement errors on the EWMA scheme to monitor the ratio of two normal variables. In another new development, the one‐sided Shewhart charts for monitoring the ratio of two normal variables in short production runs were investigated by Tran et al 16 …”
Section: Introductionmentioning
confidence: 99%
“…Nguyen and Tran 14 considered two one-sided Shewhart charts to monitor the ratio of two normal variables when measurement errors are present, while Nguyen et al 15 evaluated the effects of measurement errors on the EWMA scheme to monitor the ratio of two normal variables. In another new development, the one-sided Shewhart charts for monitoring the ratio of two normal variables in short production runs were investigated by Tran et al 16 Numerous investigations concerning the effect of measurement errors on the run-length characteristics for univariate and multivariate schemes were suggested in the literature. It is common knowledge that many process monitoring situations contain measurement errors.…”
Section: Introductionmentioning
confidence: 99%