2018
DOI: 10.1051/matecconf/201823905011
|View full text |Cite
|
Sign up to set email alerts
|

Specifics of determining the tension forces of the cable-stayed bridge elements

Abstract: Objective: to improve the method of determining the force in the cable stays by frequencies of natural transverse oscillations. Methods: synthesis and analysis of theoretical and experimental data, experimental methods for studying the structures. Results: in the paper, the problems of determining the tension forces of the cable stays by the frequencies of their natural oscillations are considered taking into account various factors (the design of anchor fastenings, the angle of inclination and sagging of the … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
7
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
2
1
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(7 citation statements)
references
References 1 publication
0
7
0
Order By: Relevance
“…The method for determining the tension force of the cable-stayed element [16] was developed on the basis of the results of control of the forces in cable-stayed suspensions of the Bugrinsky Bridge across the river Ob in Novosibirsk in the process of construction and the initial period of operation [10,15]. Approbation and verification of the method [16] was carried out in the process of monitoring the forces in the cable stays of the bridge across the river Irtysh on the bypass of Pavlodar [14,15], Vinogradovsky Bridge across the Tatyshev channel in Krasnoyarsk [17], Ugra Bridge across the river Ob near the city of Surgut [13].…”
Section: Methodsmentioning
confidence: 99%
See 4 more Smart Citations
“…The method for determining the tension force of the cable-stayed element [16] was developed on the basis of the results of control of the forces in cable-stayed suspensions of the Bugrinsky Bridge across the river Ob in Novosibirsk in the process of construction and the initial period of operation [10,15]. Approbation and verification of the method [16] was carried out in the process of monitoring the forces in the cable stays of the bridge across the river Irtysh on the bypass of Pavlodar [14,15], Vinogradovsky Bridge across the Tatyshev channel in Krasnoyarsk [17], Ugra Bridge across the river Ob near the city of Surgut [13].…”
Section: Methodsmentioning
confidence: 99%
“…To measure the response of structures to external influences, sensitive vibration sensors-accelerometers (measuring range from -610 • 10 -3 to + 610 • 10 -3 m/s 2 , sampling frequency -100 Hz) and strain gauges (measuring range from -1000 • 10 -9 to + 1000 • 10 -9 m, the inaccuracy of deformation measurements is ± 1.5%) were used. The vibration records were processed using specialized software "Tensor MS" [19] and "Vant" ("Cable stay") [20], in which the algorithm for fast Fourier transform with Welch window transformation is implemented.…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations