1991
DOI: 10.1063/1.40067
|View full text |Cite
|
Sign up to set email alerts
|

SP-100 scaleup to 40 MWe

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1992
1992
2009
2009

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The SP-100 was never built, although several components were developed and tested for it. For application to the present mission requirement, the SP-100 design would be modified 6,7 . One upgraded design would use SP-100 fuel, but it would require increasing the power output by a factor of 150 to 15 MWe by increasing the reactor size.…”
Section: Sp-100mentioning
confidence: 99%
“…The SP-100 was never built, although several components were developed and tested for it. For application to the present mission requirement, the SP-100 design would be modified 6,7 . One upgraded design would use SP-100 fuel, but it would require increasing the power output by a factor of 150 to 15 MWe by increasing the reactor size.…”
Section: Sp-100mentioning
confidence: 99%