2019
DOI: 10.3846/jcem.2019.9644
|View full text |Cite
|
Sign up to set email alerts
|

Sorting Subcontractors’ Activities in Construction Projects With a Novel Additive-Veto Sorting Approach

Abstract: Selection processes in civil engineering infrastructure projects might require more time and effort than the decisionmakers involved in these projects are normally prepared to devote to running them. A novel approach is proposed to sort these activities into classes that represent their impact on the project, namely additive-veto sorting model, which should be considered before any bidding procedure. Therefore, problems regarding the client’s satisfaction caused by subcontractors can be avoided, and the decisi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 44 publications
0
1
0
1
Order By: Relevance
“…Koçak et al [17] have adopted an approach to create a new alternative to SC selection with the Additive Ratio Assessment Method, which is one of the multi-criteria decision-making (MCDM) techniques that can be more scientific, instead of traditional practices in the construction industry. Palha et al [18] have developed a method for pre-tender selection based on a real case study that provides insight into the activities of SCs. El-khalek et al [19] aims to identify, analyze and prioritize the most important criteria affecting the SC selection process using the statistical analysis approach.…”
Section: Subcontractor Evaluation and Selection Processesmentioning
confidence: 99%
“…Koçak et al [17] have adopted an approach to create a new alternative to SC selection with the Additive Ratio Assessment Method, which is one of the multi-criteria decision-making (MCDM) techniques that can be more scientific, instead of traditional practices in the construction industry. Palha et al [18] have developed a method for pre-tender selection based on a real case study that provides insight into the activities of SCs. El-khalek et al [19] aims to identify, analyze and prioritize the most important criteria affecting the SC selection process using the statistical analysis approach.…”
Section: Subcontractor Evaluation and Selection Processesmentioning
confidence: 99%
“…A priorização de projetos é uma atividade complexa considerando a existência de múltiplos critérios de avaliação e as possíveis combinações de alternativas a serem priorizadas, podendo ser realizada através de um processo de escolha, ranking, classificação de prioridade ou portfólio (PALHA et al, 2019). Em outras situações, como apresentado por Palha (2019), este processo pode envolver além da seleção de alternativas através de múltiplos critérios, a compatibilização de vários decisores.…”
Section: Introductionunclassified