2023
DOI: 10.1002/net.22159
|View full text |Cite
|
Sign up to set email alerts
|

Solving the time capacitated arc routing problem under fuzzy and stochastic travel and service times

Abstract: Stochastic, as well as fuzzy uncertainty, can be found in most real‐world systems. Considering both types of uncertainties simultaneously makes optimization problems incredibly challenging. In this paper we propose a fuzzy simheuristic to solve the Time Capacitated Arc Routing Problem (TCARP) when the nature of the travel time can either be deterministic, stochastic or fuzzy. The main goal is to find a solution (vehicle routes) that minimizes the total time spent in servicing the required arcs. However, due to… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 69 publications
0
1
0
Order By: Relevance
“…The optimization of the space mission supply chain is critical to ensure the efficient and continuous flow of resources and equipment needed for space exploration. Space agencies can reduce costs and optimize resource utilization by utilizing advanced logistics and supply chain management strategies such as demand forecasting, inventory optimization, and efficient transportation [77][78][79].…”
Section: Optimization Of the Space Mission Supply Chainmentioning
confidence: 99%
“…The optimization of the space mission supply chain is critical to ensure the efficient and continuous flow of resources and equipment needed for space exploration. Space agencies can reduce costs and optimize resource utilization by utilizing advanced logistics and supply chain management strategies such as demand forecasting, inventory optimization, and efficient transportation [77][78][79].…”
Section: Optimization Of the Space Mission Supply Chainmentioning
confidence: 99%
“…Also, a similar effect can be observed when considering a pure fuzzy scenario, where a fuzzy approach generates solutions OB-F with an average value of 7991.6, which again is slightly better than the average makespan provided by the deterministic solutions when employed in the fuzzy scenario (OBD-F, with a value of 8057.0). Finally, Martin Solano et al [46] introduced a fuzzy simheuristic for solving the time-capacitated arc routing problem under both stochastic and fuzzy uncertainty. In the proposed approach, the results obtained when solving a set of classical instances are summarized in the box-plots displayed in Figure 8.…”
Section: Recent Applications Of Fuzzy Simheuristicsmentioning
confidence: 99%