2012
DOI: 10.1016/j.procir.2012.07.052
|View full text |Cite
|
Sign up to set email alerts
|

Software Evaluation Criteria for Rapid Factory Layout Planning, Design and Simulation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
19
0
1

Year Published

2013
2013
2023
2023

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 33 publications
(20 citation statements)
references
References 5 publications
0
19
0
1
Order By: Relevance
“…Secondly, in order to shorten the digital lifecycle and reduce unnecessary costs, demand analysis should precede the product design process. Another observation is that a DF must be supported by key computing and technical infrastructure such as for real time data manipulation, 3D visualization and interoperability (Shariatzadeh et al, 2012).…”
Section: Factory Design Methodsmentioning
confidence: 99%
“…Secondly, in order to shorten the digital lifecycle and reduce unnecessary costs, demand analysis should precede the product design process. Another observation is that a DF must be supported by key computing and technical infrastructure such as for real time data manipulation, 3D visualization and interoperability (Shariatzadeh et al, 2012).…”
Section: Factory Design Methodsmentioning
confidence: 99%
“…building, machinery, foundation, media), which need to be analyzed in combination. The different partial solutions are usually developed by various stakeholders, but typically interfere and require each other [18]. Appropriate visualization tools to support collaborative factory planning must be able to coordinate different layouts and viewpoints on the factory as well as exchange and manage information and models from different domains.…”
Section: Application Example: Factory Planningmentioning
confidence: 99%
“…These aspects usually result in different partial-models with specific information content (e.g., layout model, process model) and components of the factory (e.g., building, machinery, foundation, media), which need to be analyzed in combination. The different partial solutions are usually developed by various stakeholders, but typically interfere and require each other [70]. The major tasks regarding collaborative factory planning are [71]:…”
Section: Task Definitionmentioning
confidence: 99%