2013 Aviation Technology, Integration, and Operations Conference 2013
DOI: 10.2514/6.2013-4354
|View full text |Cite
|
Sign up to set email alerts
|

Simulation-Based Airport Capacity Estimation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…Airspace capacity evaluation originated in the 1940s [5] . The main methods commonly used today are mathematical model-based methods [6] , controller workload-based methods [7] , computer simulation-based methods [8] , and data-driven methods [9] . Cheung et al proposed a Mixed Integer Programming (MIP) airport scheduling optimization model considering runway capacity to address the problem of capacity-demand imbalance during peak hours, and verified the advantages of dynamic airport capacity and dynamic runway configuration over fixed capacity [10] .…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Airspace capacity evaluation originated in the 1940s [5] . The main methods commonly used today are mathematical model-based methods [6] , controller workload-based methods [7] , computer simulation-based methods [8] , and data-driven methods [9] . Cheung et al proposed a Mixed Integer Programming (MIP) airport scheduling optimization model considering runway capacity to address the problem of capacity-demand imbalance during peak hours, and verified the advantages of dynamic airport capacity and dynamic runway configuration over fixed capacity [10] .…”
Section: Introductionmentioning
confidence: 99%
“…Step 3-2:Calculate air route impedance value a ij w , the calculation method is shown in formula (8).…”
mentioning
confidence: 99%